Look up there in the sky - it's not a bird, or a plane but a refurbed 92TS
Well it looks like the end is almost in sight. Eagle eyed version-3-point-one spotted the refurbished trains being carried from their make-over in Doncaster back to their rightful homes in London. So does this look as though the Waterloo & City Line will be on time for its re-opening in early September.
Version-3-point-one says "The work will be continuing next weekend, so if you want to catch some flying trains, make sure you don't miss them. Take the Jubilee Line exit out of Waterloo station and turn right out - Lower Marsh is signposted." The rest of her set of pictures can be seen here.
And that shot just above is the closest I want to get to seeing the underside or "belly of the beast" as she so nicely puts it.
Does anyone want to place bets on when it will actually open though? TfL are still hedging their bets with "early September". Metronet were being superbly optimistic by saying 1st September. whereas Wikipedia have plumped for the 4th September. Which will it be?
No comments:
Post a Comment